问题描述:

是否有人听说过"0基本时间表"一词? 如果是这样,有人可以确切地定义这意味着什么吗?

Has anyone heard the term "0 base schedule"?  If so can someone define exactly what this means?

谢谢。

Leah12,

Leah12,

更常见的概念是"零基预算"。但他同样的概念适用于调度。

The more common concept is "zero based budgeting" but he same concept would apply to scheduling.

基本前提很简单。您可以从空白表开始,而不是根据以前的模型(例如去年的预算或计划)创建新的预算或计划。这并不意味着您不能使用历史数据作为指南,但您不能以"模板"开头。

The basic premise is simple. Instead of creating a new budget or schedule based on a previous model (e.g. last year's budget or schedule), you start with a blank sheet. It doesn't mean you can't use historical data as a guide but you don't start with a "template".

我们的想法是不要偏向于您已经存在的但是要重新考虑这个过程,就像你从头开始一样,因为你是。

The idea is to not be biased by what you already have but to rethink the process as if you were starting from scratch, because you are.

要进行更深入的讨论,你可能想要进行谷歌搜索。

For more in-depth discussion you might want to do a Google search.

希望这会有所帮助。

John